"The Superconducting Super Collider Laboratory
was a DOE supported facility. The U.S. House of Representatives
decided in 1993 to halt the project after
14 miles of tunneling were completed and two billion dollars spent.
The laboratory, located South of Dallas, TX, is in the final shutdown
phase". From http://www.hep.net/ssc/